The long awaited day for me has finally arrived. Wade (W5ERX), my son Nick and myself Placed the DX Engineering Hex on top of the waiting 90′ tower. I have been talking DX for the last day at only 100 WATTS! I will write a separate blog for the performance of this beam, I can tell you that I am seeing anywhere from 2 to 3 S UNITS of front to back THATS 18 db at times. Its hard to get locked on to a station with the poor conditions of the bands but so far in the last day I have managed to work:
- Hawaii
Germany
Mexico
Costa Rica
Brazil
Northern Ireland
Italy
Slovenia
England
Bulgaria
GRAND Flash Album Gallery
Skins for GRAND FlAGallery, Photo Galleries, Video Galleries
developed by CodEasily.com - WordPress Flash Templates, WordPress Themes and WordPress plugins
The Flash Player and a browser with Javascript support are needed..
Popularity: 67% [?]
